Project
feasibility of Mega Artificial Recharge
to underground water table for Jalgaon
district for TIDC, Maharashtra Irrigation
Dept under Central Govt. assistance.
Project Cost: Rs.1000 Crores.
Project Status : Feasibility
study concluded: Detailed Project Report
under formulation
Study and preparation of report for
proposed augmentation of 6 MW power
generation at Tillary Hydropower Project,
Maharashtra under BOT system.
Project Cost: Rs.125 Crores.
Consultancy: Completed.
Preparation
of feasibility, detailed project report,
providing Detailed Project management
& Design Services for 9 Nos. Captive
Power Plant Projects under Govt. of
Maharashtra policy of privatization
of power sector for generation of electric
power.- Preliminary Feasibility Report
: Completed
Project Cost:Rs.100 Cr
Project Status :[Consultancy
assignment: Completed.]
Preparing
Feasibility Report of YEDGAON HEP for
CPP:
Client -Laxmi Organic Industries Ltd.,
Mumbai - Consultancy Assignment completed
(May '04). Assignment of preparing Detailed
Project Report is in process. LOIL have
been given a Letter of Intent for allotment
of Yedgaon HEP site for CPP and to submit
DPR for consideration of Govt. (by 31.03.2006).
DPR is under preparation.
2 x 1.5 MW HEP
Preparing
Feasibility Report of TEMGHAR HEP for
CPP: Client -Suvas Holdings Pvt. Ltd.,
Mumbai - Consultancy Assignment completed
(April 04). MOU with SHPL given
as Technical Consultants for preparing
Detailed Project Report, Estimation,
Tendering and Superintendence till commissioning
signed, for tendering for the HEP site
by GoMID.
1 x 2.5 MW HEP Project Cost: Rs.9.84
Cr.
Clients offer is under process
with GoMID.
Preparing
Feasibility Report of NIRA DEOGHAR HEP
for CPP:
Client - Suvas Holdings Pvt. Ltd., Mumbai.
MOU with SHPL given as Technical Consultants
for preparing Detailed Project Report,
Estimation, Tendering and Superintendence
till commissioning signed, for tendering
for the HEP site by GoMID.
2 x 3.5 MW HEP
Project Cost: Rs.30 Cr.
M/s Suvas Holding Ltd. have decided
not to bid for the site.
New Client: M/s Celerity Power Pvt.
Ltd.
Feasibility Report prepared & the
Clients have submitted bid to GoM, WRD.
Technical
Opinion to M/s Dyckerhoff & Widmann
(DYWIDAG),
Mumbai for outfall project, MCGM
COMPLETED.
Preparing
Feasibility Report of KONAL HEP for
CPP:
Client - Shri Mahalaxmi Construction
Corporation Ltd., Pune [Changed to
Mahalaxmi Vidyut Pvt. Ltd.] MOU with
MVPL for Technical Consultancy for preparing
Detailed Project Report, Estimation,
Tendering and Superintendence till commissioning
signed, for tendering for the HEP site
by GoMID.
2 x 5.0 MW HEP Project Cost: Rs.52 Cr.
Client has secured the Letter of Intent
from the GoMID.
Detailed Project Report has been approved
by GoMID [now known as Govt. of Maharashtra
Water Resources Department - GoMWRD].
Bids for procurement of Electrical &
Mechanical equipment are being evaluated.
Due
Diligence Report on Bhandardara 2 (MH)
1 x 34 MW
Review condition of existing
plant.
Review refurbishment budget estimate
and contingencies. Birsinghpur (MP)
2 x 1.1 = 2.2 MW
Review current completion status.
Estimate time and cost to enter
Commercial operations. Sechi, Melan
and Panwi (HP) 2 x 2.25 MW, 2 x 2 MW,
2 x 2.25 MW
Assess the quality of hydrology
data and methodology.
Verify design capacity and forecast
PLF.
Review capital cost (EPC) estimates
and contingencies.
Verify that appropriate seismic
design factors were used.
Development Projects: Preliminary feasibility
assessment for 9 HEPs
1. SAILAN (2 x 750 kW)
2. CHAUNDA (2 x 1,200 kW)
3. RAJPUR (2 x 2,250 kW)
4. NOGLI (2 x 1,500 kW)
5. NOGLI-I (2 x 1,000 kW)
6. SARTU (2 x 1,200 kW)
7. RAURA (2 x 4,000 kW)
8. KUT (2 x 12,000 kW)
9. TIDONG-II (3 x 23,330 kW)
Preparing
PQ Document for tendering & Feasibility
Report of DARNA HEP for IPP:
Client - Dodson Lindblom Hydro Power
Pvt. Ltd., Mumbai - MOU with DLHPPL
as Technical Consultants for preparing
Detailed Project Report, Estimation,
Tendering and Superintendence till commissioning
signed, for tendering for theHEP site
by GoMWRD.
2 x 1.5 = 3 MW HEP Project Cost: Rs.12.75
Cr.
Preparing
Feasibility Report of UPPER VAITARNA
HEP for IPP under Self Identified Projects:
Client - Dodson Lindblom Hydro Power
Pvt. Ltd., Mumbai - MOU with DLHPPL
as Technical Consultants for preparing
Detailed Project Report, Estimation,
Tendering and Superintendence till commissioning
signed, for tendering for the HEP site
by GoMWRD.
2 x 1.5 = 3 MW HEP Project Cost: Rs.13.0
Cr.
Preparing
PQ Document for tendering & Feasibility
Report of GAIBY HEP for CPP: Client
- New Bombay Ispat Udyog Pvt. Ltd.,
Mumbai - MOU with NBIUPL as Technical
Consultants for preparing Detailed Project
Report, Estimation, Tendering and Superintendence
till commissioning signed, for tendering
for the HEP site by GoMWRD.
1 x 3.5 MW HEP
Project Cost: Rs.16.00 Cr.
Preparing
PQ Document for tendering & Feasibility
Report of AMBAI HEP for CPP: Client
- New Bombay Ispat Udyog Pvt. Ltd.,
Mumbai - MOU with NBIUPL as Technical
Consultants for preparing Detailed Project
Report, Estimation, Tendering and Superintendence
till commissioning signed, for tendering
for the HEP site by GoMWRD.
2 x 1.5 = 3 MW HEP
Project Cost: Rs.12.00 Cr.
Preparing
PQ Document for tendering & Feasibility
Report of Darna HEP for IPP: Client-
Dodon-Lindblom Hydro Projects Pvt. Ltd.Mumbai
- MOU with DLHPPL as Technical Consultants
for preparing Detailed Project Report,
Estimation, Tendering and Superintendence
till commissioning signed, for tendering
for the HEP site by GoMWRD.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.
Preparing
PQ Document for tendering & Feasibility
Report of KUNDALIKA HEP for IPP: Client
- Shree Balaji Power Services Pvt. Ltd.,
Thane. Project involves construction
of diversion gated weir structure across
Kundalika River & a Power house
- MOU with SBPSPL as Technical Consultants
for preparing Detailed Project
Report, Estimation, Tendering and Superintendence
till commissioning signed, for
tendering for the HEP site by GoMWRD.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.
Preparing
PQ Document for tendering & Feasibility
Report of Barvi HEP for IPP: Client
- Dodon-Lindblom Hydro Projects Pvt.
Ltd., Mumbai - MOU with DLHPPL as Technical
Consultants for preparing Detailed Project
Report, Estimation, Tendering and Superintendence
till commissioning signed, for tendering
for the HEP site by MIDC.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.