Planning, Designing, Feasibility & Execution :
Project feasibility of Mega Artificial Recharge to underground water table for Jalgaon district for TIDC, Maharashtra Irrigation Dept under Central Govt. assistance.
Project Cost: Rs.1000 Crores.
Project Status : Feasibility study concluded: Detailed Project Report under formulation
Study and preparation of report for proposed augmentation of 6 MW power generation at Tillary Hydropower Project, Maharashtra under BOT system.
Project Cost: Rs.125 Crores.
Consultancy: Completed.
Preparation of feasibility, detailed project report, providing Detailed Project management & Design Services for 9 Nos. Captive Power Plant Projects under Govt. of Maharashtra policy of privatization of power sector for generation of electric power.- Preliminary Feasibility Report : Completed
Project Cost: Rs.100 Cr
Project Status : [Consultancy assignment: Completed.]
Preparing Feasibility Report of YEDGAON HEP for CPP:
Client -Laxmi Organic Industries Ltd., Mumbai - Consultancy Assignment completed (May '04). Assignment of preparing Detailed Project Report is in process. LOIL have been given a Letter of Intent for allotment of Yedgaon HEP site for CPP and to submit DPR for consideration of Govt. (by 31.03.2006). DPR is under preparation.
2 x 1.5 MW HEP
 
Preparing Feasibility Report of TEMGHAR HEP for CPP: Client -Suvas Holdings Pvt. Ltd., Mumbai - Consultancy Assignment completed (April ’04). MOU with SHPL given as Technical Consultants for preparing Detailed Project Report, Estimation,
Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMID.
1 x 2.5 MW HEP Project Cost: Rs.9.84 Cr.
Client’s offer is under process with GoMID.
 
Preparing Feasibility Report of NIRA DEOGHAR HEP for CPP:
Client - Suvas Holdings Pvt. Ltd., Mumbai. MOU with SHPL given as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMID.
2 x 3.5 MW HEP
Project Cost: Rs.30 Cr.
M/s Suvas Holding Ltd. have decided not to bid for the site.
New Client: M/s Celerity Power Pvt. Ltd.
Feasibility Report prepared & the Clients have submitted bid to GoM, WRD.
Technical Opinion to M/s Dyckerhoff & Widmann (DYWIDAG),
Mumbai for outfall project, MCGM – COMPLETED.
Preparing Feasibility Report of KONAL HEP for CPP:
Client - Shri Mahalaxmi Construction Corporation Ltd., Pune [Changed to
Mahalaxmi Vidyut Pvt. Ltd.] MOU with MVPL for Technical Consultancy for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMID.
2 x 5.0 MW HEP Project Cost: Rs.52 Cr.
Client has secured the Letter of Intent from the GoMID.
Detailed Project Report has been approved by GoMID [now known as Govt. of Maharashtra Water Resources Department - GoMWRD]. Bids for procurement of Electrical & Mechanical equipment are being evaluated.
Due Diligence Report on Bhandardara 2 (MH) 1 x 34 MW
• Review condition of existing plant.
• Review refurbishment budget estimate and contingencies. Birsinghpur (MP) 2 x 1.1 = 2.2 MW
• Review current completion status.
• Estimate time and cost to enter Commercial operations. Sechi, Melan and Panwi (HP) 2 x 2.25 MW, 2 x 2 MW, 2 x 2.25 MW
• Assess the quality of hydrology data and methodology.
• Verify design capacity and forecast PLF.
• Review capital cost (EPC) estimates and contingencies.
• Verify that appropriate seismic design factors were used.

Development Projects: Preliminary feasibility assessment for 9 HEPs
1. SAILAN (2 x 750 kW)
2. CHAUNDA (2 x 1,200 kW)
3. RAJPUR (2 x 2,250 kW)
4. NOGLI (2 x 1,500 kW)
5. NOGLI-I (2 x 1,000 kW)
6. SARTU (2 x 1,200 kW)
7. RAURA (2 x 4,000 kW)
8. KUT (2 x 12,000 kW)
9. TIDONG-II (3 x 23,330 kW)
 
Preparing PQ Document for tendering & Feasibility Report of DARNA HEP for IPP:
Client - Dodson Lindblom Hydro Power Pvt. Ltd., Mumbai - MOU with DLHPPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for theHEP site by GoMWRD.
2 x 1.5 = 3 MW HEP Project Cost: Rs.12.75 Cr.
Preparing Feasibility Report of UPPER VAITARNA HEP for IPP under Self Identified Projects: Client - Dodson Lindblom Hydro Power Pvt. Ltd., Mumbai - MOU with DLHPPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMWRD.
2 x 1.5 = 3 MW HEP Project Cost: Rs.13.0 Cr.
Preparing PQ Document for tendering & Feasibility Report of GAIBY HEP for CPP: Client - New Bombay Ispat Udyog Pvt. Ltd.,
Mumbai - MOU with NBIUPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMWRD.
1 x 3.5 MW HEP
Project Cost: Rs.16.00 Cr.
Preparing PQ Document for tendering & Feasibility Report of AMBAI HEP for CPP: Client - New Bombay Ispat Udyog Pvt. Ltd.,
Mumbai - MOU with NBIUPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMWRD.
2 x 1.5 = 3 MW HEP
Project Cost: Rs.12.00 Cr.
Preparing PQ Document for tendering & Feasibility Report of Darna HEP for IPP: Client- Dodon-Lindblom Hydro Projects Pvt. Ltd.Mumbai - MOU with DLHPPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by GoMWRD.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.

Preparing PQ Document for tendering & Feasibility Report of KUNDALIKA HEP for IPP: Client - Shree Balaji Power Services Pvt. Ltd., Thane. Project involves construction of diversion gated weir structure across Kundalika River & a Power house - MOU with SBPSPL as Technical Consultants for preparing Detailed Project
Report, Estimation, Tendering and Superintendence till commissioning signed, for
tendering for the HEP site by GoMWRD.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.
Preparing PQ Document for tendering & Feasibility Report of Barvi HEP for IPP: Client - Dodon-Lindblom Hydro Projects Pvt. Ltd., Mumbai - MOU with DLHPPL as Technical Consultants for preparing Detailed Project Report, Estimation, Tendering and Superintendence till commissioning signed, for tendering for the HEP site by MIDC.
2 x 2.5 = 5 MW HEP
Project Cost: Rs.30.00 Cr.

Reg. Office : Shop No.05, Panchsheel-1 CHS, Raheja Township, MALAD - (E), MUMBAI - 400 097 TeleFax: +91-22-2872 6329
Branch Office : Flat No. A/ 02, Srushti Society, Guruganesh Nagar, Kothrud, PUNE - 411 025 Telefax: +91-20-2545 2753